The flooring crew is working Wednesday, Thursday, Friday, and Monday. They set the Schluter DITRA decoupling membrane and new wood flooring on Wednesday. On Thursday the tile crew is planning the layout and cutting tile as needed. On Friday, they’ll mix thin set mortar and actually lay the tile. On Monday, they’ll return to grout the tile.

The orange area is the DITRA membrane. The label at the utility closet corner and the label at the right door jamb fall pretty close to the cabinet lines allowing visualization of the kitchen work area.
Adrian Tile and Wood Flooring
http://www.adriantilehardwood.com/home.html
Adrian Tile is doing the flooring work for this project. They have a good reputation in the community and are able to work in both wood and tile which made the planning of the wood to tile interface easy. The wood crew and the tile crew are young but know their craft. My project manager, Evan Kittrel, and the craftsmen reviewed the drawings and planned all of the boarders at the start of work. The crew fit the Schluter DITRA membrane, and worked the new wood in with the old in a very professional manner.
No job is simple!
Although it appears easy, this job threw a curve or two at the installers. The plan is to put T-molding at the joints between tile and wood and this required some thought. Where should the visible tile-wood joints be? The idea is to have a butt joint between the T-moding and cabinet trim. This means wood under the cabinets just a bit at the lounge end of the kitchen.
The second tricky bit was to locate the peninsula wood to tile joint under the cabinet but at a point where the down draft hood vent could be cut through the wood.This worked out to the location you see in the photol
And no old house is ever on the level. There is a bit of a low spot at the outside corner to the right. The plan is to use a bit extra thin set there to level the floor but it is something we can’t calculate so Evan scored an additional bag of thin set mix to allow for the unpredictable extra.

Extending the wood into the kitchen requires following the original staggering of planks.

Life during the job
The crew has also been a hit with the dogs and have been good at briefing me on the things I needed to know to keep their work pristine while the job is in progress. We’ll be without the tile area Thursday, Friday, and Saturday. On Thursday, the tile will be dry placed on the slightly warped floor. In this condition, it is not completely supported and subject to bending loads from walking. The dogs and I have to stay off during this period of storage in place. On Friday, the tile will be set but the mortar remains squishy for 12 hours of so. The crew recommends that we stay off until Sunday morning to ensure that the mortar has cured without shifting a tile out of plane or disturbing the grout joints by catching a nail and dragging a tile. On Monday, we’ll need to stay off again to allow the grout to cure without nail marks.